TM22 TM22C Travel Motor Assy For E120B E312B R110 DH150 MAG 85VP Excavator Spare Parts
Description |
TM22 Travel Motor Assy, MAG 85VP Travel Motor |
Application |
E120B DH150 Excavator |
Model |
E120B E312B R110 DH150 MAG 85VP |
Part No. |
MAG 85VP |
Quality |
OEM |
Weight |
200-300 kgs |
Packing |
Pack into wooden case |
MOQ |
1PC |
Lead time |
About 1-3 working days |
Payment |
TT, Western union, Paypal, Paysend, RMB |
Warranty |
6 Months |
Shipping Port |
Huangpu Old Port, Shenzhen Yantian,Guangzhou |
More details:
Drawings:
Cautions of Final Drive Installation:
1. Clean the hydraulic oil circuit, replace the hydraulic oil filter and return oil filter. The mixing of fine particles
such as mud, sand or metal powder in the hydraulic oil will wear out motor inner parts too quickly. It is also the
main reason for the stuck phenomenon.
2. Check whether the gearbox is filled with gear oil. The volume of the gear oil should be more than half of the
total volume of the gearbox. (Generally,factory will add gear oil in final drive )
3. Generally, for a new Chinese made final drive ass'y , it is necessary to replace the new gear oil after using for
7 days or 60 hours for the first time. The second time to change the gear oil is in the 2nd -3rd months. After that,
it depends on the usuage situation of the final drive.
4.Difference between the quality of hydraulic oil (motor part) and gear oil (gear box part): Good hydraulic oil and
gear oil can extend the service life.
5. Check if the pipeline connection and the walking direction is correct.
Warranty Statement:
1. Warranty Type: We will replace the product which have quality problem.
2. Warranty Period: Supply 3 months warranty for the products from the date of arrival. Customer should check the items according to the order list after arrival.
Contact with us and offer the data, photos of the problem items
3. You need to pay for the replacement charge for following condition:
* Wrong Order from customer.
* Natural Disasters cause the damage.
* Error installation, improper use.
* The machine and reducer work over time and over load.
* Lost by any condition.
* Human element destroyed.
* Corrode with rust during stock and running.
* Warranty Expired.
FAQ :
Q1: How can i make payment ?
A : Bank transfer, Western union, Paypal, Paysend, or RMB.
bank transfer take 2-3days, while we can arrange order once received the remittance copy.
Q2: How fast you can do shipment?
A: Stock items take 1-2days, no stock items 5-7 working days. It depends on the items and the quantity of your order. We will try best to ship goods on time,
won't let you and your client down.
Q3: If we dont find what we want on your website, what should we do?
A: talk with us directly on whatsapp, email, wechat, or phone, we will check inquirys asap. excavator parts have thousands kinds, it's not possible to post
all production online.
Q4. Do your product been tested before delivery?
A: Yes, all product been tested to make sure they are qualified to sell.
Q5: Can we buy 1 pc of each item for quality testing?
A: Yes, we value every customer, no matter order amount small or big, with grateful for your trust.